Tower Inspection Reports
All reports are PDFs (Adobe Reader – free download)
2020 SGH Acceptance of Post-Maintenance Inspection Report
View Report >
2020 Fullwave Post Maintenance Inspection Report, NE Stack C, NE Leg C and South Truss Levels 2-6
View Report >
2020 ERI Inspection Report - NE Stack C, NE Leg C and South Truss Levels 2-6
View Report >
2020 ERI Plumb & Tensioning Verification Letter Stacks A, B, C
View Report >
2020 SGH Inspection Review and Assessment
View Report >
2021 BE Tensioning Report
View Report >
2019 ERI Field Inspection Report - SE Stack B, SE Leg B and East Truss Levels 2-6
View Report >
2019 SGH Review of ERI Field Inspection Report
View Report >
2019 ERI Post-Maintenace Inspection Report - SE Stack B, SE Leg B and East Truss Levels 2-6
View Report >
2019 SGH Review of ERI Post Maintenance Report
View Report >
2018 ERI Field Inspection Report - West Stack A & North Truss Level 6
View Report >
2018 ERI Field Inspection Report - West Leg A & North Truss Levels 2-3-4-5
View Report >
2018 SGH Review of ERI Field Inspection Reports
View Report >
2018 ERI Post-Maintenance Inspection Report - West Stack A, West Leg A and North Truss Levels 2-6,
View Report >
2018 SGH Review of ERI Post Maintenance Report
View Report >
2017 Inspection Report
View Report >
ABOUT THE REPORTS
Tower Inspection Reports
The annual tower structure inspection is conducted by an independent structural engineering service to identify any areas needing maintenance.
RF Antenna Exposure Reports
Exposure to RF (radio frequency) radiation is required to fall below a maximum level established as safe by the Federal Communications Commission. Exposure levels in publicly accessible areas surrounding Sutro Tower are measured by an independent professional engineering consultant upon activation of any DTV antenna or upon any increase of power by a DTV antenna or at least every 3 years.
View RF Exposure Reports >
AGREEMENT BETWEEN SUTRO TOWER, INC.
AND NEIGHBORHOOD GROUPS
During the process of obtaining permits for the DTV Conversion Project three neighborhood associations surrounding Sutro Tower indicated their concern that information about the operation of the tower is not easily available to residents. They also identified some improvements to the neighborhood were not being addressed due to lack of funds. These groups and Sutro Tower, Inc. agreed to address these concerns and the resulting document was prepared and presented to the San Francisco Planning Commission at the project approval hearing and incorporated in the Commission’s action to approve the project.
View Report >
_______________________________________
ENVIRONMENTAL IMPACT REPORT
The California Environmental Quality Act requires a study of the potential environmental impact of any major construction project and publication of the findings. The report is certified by the San Francisco Planning Commission after its review and a public hearing. Report is 79 pages.
View Report >