Safety And Environment Reports

All reports are PDFs (Adobe Reader required – free download)

2017 Annual Inspection Report
The annual tower structure inspection is conducted by an independent structural engineering service to identify any areas needing maintenance.
View Full Report >

2016 Maintenance Performed
Report on actual maintenance done on Sutro Tower in 2016.
View Full Report >

2016 Condition of Tower Report
Items that need attention as noted will be worked on during annual maintenance in the 2017 season.
View Full Report >

2016 Annual Inspection Report
The annual tower structure inspection is conducted by an independent structural engineering service to identify any areas needing maintenance.
View Full Report >

2015-16 Annual Maintenance Review
View Full Report >

October 2015 R-F Auxiliary Antenna Exposure Report
Exposure to R-F radiation is required to fall below a maximum level established as safe by the Federal Communications Commission.  Exposure levels in publicly accessible areas surrounding Sutro Tower are measured by an independent professional engineering consultant upon activation of any DTV antenna or upon any increase of power by a DTV antenna or at least every 3 years.
View Full Report >

July 2015 R-F Main Antenna Exposure Report
Exposure to R-F radiation is required to fall below a maximum level established as safe by the Federal Communications Commission.  Exposure levels in publicly accessible areas surrounding Sutro Tower are measured by an independent professional engineering consultant upon activation of any DTV antenna or upon any increase of power by a DTV antenna or at least every 3 years.
View Full Report >

2015 Annual Inspection Report
The annual tower structure inspection is conducted by an independent structural engineering service to identify any areas needing maintenance.
View Full Report >

2015 Letter from Structural Engineer
Regarding inspection and repair work.
View Letter >

2014 Annual Inspection Report
The annual tower structure inspection is conducted by an independent structural engineering service to identify any areas needing maintenance.
View Full Report >

2014  Annual Maintenance Review
View Review >

December 2014 Addendum to EIR
S.F. Planning Department report assessing the project to add 50 antennas to the Tower and control erosion around the Tower.
Addendum to EIR >
Radio Frequency Densities >
Radio Frequency Impacts >

August 2014 R-F Main Antenna Exposure Report
Exposure to R-F radiation is required to fall below a maximum level established as safe by the Federal Communications Commission.  Exposure levels in publicly accessible areas surrounding Sutro Tower are measured by an independent professional engineering consultant upon activation of any DTV antenna or upon any increase of power by a DTV antenna or at least every 3 years.
View Full Report >

2013 Annual Inspection Report
The annual tower structure inspection is conducted by an independent structural engineering service to identify any areas needing maintenance.
View Summary Report>
View Full Report >

2012 Annual Inspection Report
Each year an independent structural engineering service is commissioned to inspect the tower structure and identify any areas needing maintenance.
View Report Summary >
View Base Through Stack Report >

2011 Annual Inspection Report
Each year an independent structural engineering service is commissioned to inspect the tower structure and identify any areas needing maintenance.
View Report Summary >
View Base Through 4th Level Report >
View 4th Level Through Stack Report>

August 2011 R-F Main Antenna Exposure Report
Exposure to R-F radiation is required to fall below a maximum level established as safe by the Federal Communications Commission.  Exposure levels in publicly accessible areas surrounding Sutro Tower are measured by an independent professional engineering consultant upon activation of any DTV antenna or upon any increase of power by a DTV antenna or at least every 3 years.
View Full Report >

2010 Annual Inspection Report Summary
Each year an independent structural engineering service is commissioned to inspect the tower structure and identify any areas needing maintenance.
View Full Report >

2009 Annual Inspection Report Summary
Each year an independent structural engineering service is commissioned to inspect the tower structure and identify any areas needing maintenance.
View Full Report >

December 2009 R-F Main Antenna Exposure Report
Exposure to R-F radiation is required to fall below a maximum level established as safe by the Federal Communications Commission.  Exposure levels in publicly accessible areas surrounding Sutro Tower are measured by an independent professional engineering consultant upon activation of any DTV antenna or upon any increase of power by a DTV antenna or at least every 3 years.
View Full Report >

July 2009 R-F Auxiliary Antenna Exposure Report
Exposure to R-F radiation is required to fall below a maximum level established as safe by the Federal Communications Commission.  Exposure levels in publicly accessible areas surrounding Sutro Tower are measured by an independent professional engineering consultant upon activation of any DTV antenna or upon any increase of power by a DTV antenna or at least every 3 years.
View Full Report >

Dausman Joins Tower Staff
Transitions to General Manager as Gene Zastrow retires
View Full Report >

Agreement Between Sutro Tower, Inc. and Neighborhood Groups
During the process of obtaining permits for the DTV Conversion Project three neighborhood associations surrounding Sutro Tower indicated their concern that information about the operation of the tower is not easily available to residents.  They also identified some improvements to the neighborhood were not being addressed due to lack of funds.   These groups and Sutro Tower, Inc. agreed to address these concerns and the resulting document was prepared and presented to the San Francisco Planning Commission at the project approval hearing and incorporated in the Commission’s action to approve the project.
View Full Report >

2008 Annual Inspection Report Summary
Each year an independent structural engineering service is commissioned to inspect the tower structure and identify any areas needing maintenance.
View Full Report >

Environmental Impact Report
The California Environmental Quality Act requires a study of the potential environmental impact of any major construction project and publication of the findings.  The report is certified by the San Francisco Planning Commission after its review and a public hearing. Report is 79 pages.
View Full Report >